Skip to content
What single operational rule most accelerated LTMS-PIP—and what should be refined to scale beyond 200 MW?
Where does HVDC beat HVAC for BIMP-PIP, considering distance, subsea depth, and expected flows?
What would make the SingaporeLink bankable at scale—contract structures, credit wraps, or phased capacity?
How should curtailment and ancillary services be handled in cross-border PPAs and wheeling tariffs?
What low-regret storage placements best complement hydropower imports and long-haul HVDC in weak-grid nodes?
Speakers
Nadhilah Shani , Head of the Power Generation and Interconnection Department, ASEAN Centre for Energy
Andre E. Susanto , Chief Technology Officer, Quantum Power Asia
Adrian Lian , Managing Director, Regional Head of Energy, Asia Pacific, ING Bank
Colin Ho , Senior Vice President, Energy Generation and Trading, Banpu NEXT
Ganesh Karki , President, Independent Power Producers' Association Nepal